Basic Info.
Product Description
pp nonwoven spunbond geotextile composite glass fiber polyester geogrid
Fiberglass geogrid composite geotextile is a new material compounded of geogrid and geotextile.It is a new anti-seepage and water-permeable composites widely used in preventing asphalt pavement cracking reflection and improving the road loading capacity.It is resistant to fatigue cracking and high-temperature and can delay cracking reflection and extend roads life span.
Main Specification:
Geogrid: 50*50 KN, 60*60 KN, 80*80 KN, 100*100 KN, 120*120 KN, 200*200 Kn....
Nonwoven fabric: 20g/ 30g/ 50g/ 80g/ 100g
Or as per your requirements.
Specifications
Fiberglass geogrid stitched with Nonwoven geotextile:
Item No. | Tensile Strength (MD CD) | Elongation (%) | Mesh Size (mm ) | Width (m) |
EGR 5050 | 50 50 | 4 | 5-50 | 2-6 |
EGR 8080 | 80 80 | 4 | 5-50 | 2-6 |
EGR 100100 | 100 100 | 4 | 5-50 | 2-6 |
Polyester geogrid stitched with Nonwoven geotextile:
Item No. | Tensile Strength (MD CD) | Elongation (%) | Mesh Size (mm ) | Width (m) |
EPR 50 | 50 14 | 13 | 5-50 | 2-6 |
EPR 100 | 100 14 | 13 | 5-50 | 2-6 |
EPR 200 | 200 14 | 13 | 5-50 | 2-6 |
EPR 400 | 400 14 | 13 | 5-50 | 2-6 |
EPR 600 | 600 14 | 13 | 5-50 | 2-6 |
EPR 5050 | 50 50 | 13 | 5-50 | 2-6 |
EPR 100100 | 100 100 | 13 | 5-50 | 2-6 |
EPR 200200 | 200 200 | 13 | 5-50 | 2-6 |
Packing & Delivery
Different products have different packing quantity, for detailed info pls feel free to contact us
Delivery Time: 3-15 days
Sample Time: 1-3 days
Payment Methord: T/T, L/C, Western Union or as per negotiate
Application
1. New road and renovation project;
2. Asphalt overlay on the old cement concrete road surface;
3. Repair of asphalt pavements cracks and old asphalt road;
4. To be reinforced layer for airport runway, bridge, playground
Our services
1. Reply your inquiry in 24 working hours.
2. Experienced staffs answer all your questions in fluent English
3. Special discount and protection of sales are provided to our distributor.
4. Sample:we can send out sample for test in one week if the order quantity is big enough. But the shipment charges is usually paid by your side,the charges will be rebounded when we haveformal order.
5. Professional factory: We are manufacturer,specializing in producing all kinds of geogrids for more than 10 years, competitive with good quantity.
6. As an honest seller, we always use superior raw material, advanced machines,skilled technicians to ensure our products to be finished in high quality and stable feature.
Related Products
Our Company
ELITE was established in 2007, has become one of the leading and professional suppliers of Geocynthetic products
Elite have one full set of precise testing instrument and quality inspection team, technology research & Development team.
Elite own a team with 10+ years experience.We know well of geosynthetics on technical inspection, marketing, transportation.
Q1. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q2. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q3. How about your delivery time?
A: Generally, it will take 7 to 15 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q4. Can you produce according to the samples?
A: Yes, we can produce by your samples or detailed requirement.
Q5. What is your sample policy?
A: We can supply the sample for testing, but the customers have to pay the sample cost and
the courier cost.
Ms. Helen Chu
Mobile & : +86 18668055321