Automatic Pick-up Device Manipulator for Rubber Batch off

Get the best Automatic Pick-up Device Manipulator for Rubber Batch-off at our factory. Increase efficiency and productivity with our top-notch product." #SEO #RubberBatchOff #Factory
Request a Quote

PRODUCTS DETAILS

Basic Info.

Model NO.
XGPL-600
Name
Automatic Handling Device Manipulator
Rubber Sheet Width
600mm, or as Required
Hanging Rod Material
Stainless Steel
Rubber Sheet Thickness
4-12mm
Cooling Fan Quantity
8, 12, 16, 20, or as Required
Cooling Fan Power
0.55kw
Cooling Temperature
Room Temperature +5
Structure
Floor Standing Type
Delivery Time
Within 30 Working Days After Receiving The Deposit
Transport Package
Standard Export Packing
Specification
Motor total power: 12.4kw
Trademark
BORIA
Origin
Qingdao, China
HS Code
8477800000
Production Capacity
50 Sets Per Month

Product Description

floor-standing type rubber sheet cooling machine
I. Brief company profile
1. We are a factory with more than 10 years manufacturing experiences on rubber machine.
2. Our engineers have about 25 years design experiences on rubber machine.
3. Our machines are manufactured according to CE standard. 
4. Exporting countries are more than 125 countries. Such as America, Canada, Mexico, Argentina, Colombia, Ukraine, Russia, Uzbekistan, Germany, India, Indonesia, Malaysia, Australia, Pakistan, etc.
5. There are 15 experienced engineers and 108 skilled workers in our company, guaranteeing delivery on time as stipulated in the contract. At the same time, the company established a long-term cooperative relation with Cosco, MSK, YML, etc., for ensuring the goods arriving port on time.
6. Our company professional manufacture rubber vulcanizing press (frame type,four column type,lab press and so on)rubber mixing millbatch off coolerrubber extruderrubber strip making machine and 
tire recycling equipment.
Automatic Pick-up Device Manipulator for Rubber Batch off

II. Introduction
1. The batch off unit take off adopts steel conveying rollers, equipped with printer and slitter. The take-off and lifting device are driven by a common AC inverter motor. The conveying speed ID adjustable.
2. The sheet is uniformly coated with the lubricator by dipping without polluting the environment. Its cooling effect is better than the spraying.

3. The hanging up area is fully closed, which adopts the blower to blow the sheet at a slant. So it improves the air flowing direction and cooling effect.
4. The electric control system adopts a reliable and automatic PC


III. Technical parameter of XGPL-600
Item XGPL-600~700 XGPL-800~1000
Suitable rubber sheet size (4-12)x600~700 (4-12)x800~1000
Max. line speed of front access conveyor belt 31m/min 36m/min
Max. line speed of hanging rod 0.7-4.2m/min 0.6-4.2m/min
Axial fan 0.37kw 5760m³/min 0.37kw 5760m³/min
Swing rubber range and frequency 1.2m 10-16times/min 1.2m 10-16times/min
Rubber sheet temperature after cooling ≤ room temperature +5ºC ≤ room temperature +5ºC
Speed adjustment control method Inverter control Inverter control

IV. Picture For Reference
Automatic Pick-up Device Manipulator for Rubber Batch off

1) Hanging rod type - mainly used for cooling rubber sheet with 4-12mm thickness
Automatic Pick-up Device Manipulator for Rubber Batch off
2) Mesh belt type - mainly used for cooling rubber sheet with 1-8mm thickness
Automatic Pick-up Device Manipulator for Rubber Batch off

3) Cooling drum type - mainly used for cooling rubber sheet with 1-6mm thickness
Automatic Pick-up Device Manipulator for Rubber Batch off

V. Machines' Working Pictures in Our Customers' Plant for Your Reference
Automatic Pick-up Device Manipulator for Rubber Batch off
Automatic Pick-up Device Manipulator for Rubber Batch off

Automatic Pick-up Device Manipulator for Rubber Batch off
Automatic Pick-up Device Manipulator for Rubber Batch off

VI. Test Running Before Delivery
Before leaving factory, this rubber sheet cooling machine needs to pass 24 hours' test running and guarantee no oil leakage and seeping to avoid unnecessary quality problems.

Automatic Pick-up Device Manipulator for Rubber Batch off

VII. Packaging
Equipment painting completed before delivery, and then wrapped with stretch film, to protect the painting surface, we use wooden packaging outside.The key parts of the machine, such as electronic control box, will be wrapped by shockproof packaging materials, and then packed in wooden cases.

Automatic Pick-up Device Manipulator for Rubber Batch off
Automatic Pick-up Device Manipulator for Rubber Batch off

VIII. Our service
1. Test running: The above machines are all passed inspection of 3~5 hours of full load operation before leaving our factory. And we will take the video and send it to you for inspection. You can use it directly thus saving the time of test-run and expense. And we also warmly welcome to our factory to inspect and test running.
2.Warranty: 12 months after installation, if our machines have any problems, please feel free to contact me. We will solve it for you as soon as possible, and give you the best services.

If you interested in our products mentioned above. Kindly let us know by return email. Then I will supply you with further information. Meanwhile, welcome to visit our factory!

FAQ:
1. Q: Where is your factory? How can I visit ?
A: Our factory located in Qingdao city.You can fly to QINGDAO  LIUTING airport,then we can pick you up to our factory for your visiting.We are looking forward to your visiting.

2. Q: How does your factory control the quality of machines and after sales service?
A: Our machines have passed CE, ISO, SGS certification, with best quality and reasonable price. All our machines have 1 year guarantee, will be provided for a lifetime maintenance.

3. What's your payment term?
A: Common is 30% deposit by T/T, the balance paid against shipping documents
Or L/C at sight.

4. Q: Can you design new product for us?
A: We have a professional development team that can make new products according to your requirements.

5. Delivery time of the rubber machines?
This is specially designed machine according to your specific requirement.
 From engineer designing to production completion, it needs about 25 to 35 days.
 
6. What does your factory do regarding quality control?
 We pay much more attention to the quality controlling from the very beginning to the end of production.
 Every machine will be fully assembled and carefully tested before shipment.
 
7. What's the machine quality guarantee?
we provide one year warrenty for our machines.We choose the world's famous brand of components to keep our machine in perfect working condition.
 
8. Are you able to provide the installation and commissioning of machines overseas? How long will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation.
 Small machine usually takes within 2~3 days.
 Big plant usually takes about 30 days.
 
9. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order.
The core of our company culture is innovation, quality, integrity and efficiency. Also we have had much good cooperation with world famous rubber production manufacturers. If you come to our factory, we can show you're the user around us.

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours